| « Petmate Electronic Portion Control Le Bistro | 1200 Conversion Pt. 2 » |
I just got back from dropping the cylinders off at my local UPS Store to be shipped up to Nallin's. So this whole project's really starting to take off. Now I've got to deal with getting the heads worked on and chroming/powder coating the rocker box covers.
Trackback URL (right click and copy shortcut/link location)