• Home
  • Contact
  • Log in
 
« The Cylinders And Pistons Are BackSetting Up The 2m/70cm Vertical »

Starting The Rebuild

04/19/06

Permalink 09:06:47 pm, by stjeanp Email , 110 words   English (US) latin1
Categories: Harley-Davidson

Starting The Rebuild

Mine and Crude's schedules both had some free time today so I went over there to do some of the non-engine work. We got the new neutral switch and front pulley installed, and put in the throttle lock and new lower right control housing. Crude also helped me out by getting the connector that I worked on when I installed the tach put back behind the headlight housing. All in all a productive evening.

And I heard from Nallin, the pistons are supposed to be in tomorrow, so they'll be shipping everything back to me later on this week. Hopefully that means that the final reassembly will happen next weekend.

Trackback address for this post

This is a captcha-picture. It is used to prevent mass-access by robots.
Please enter the characters from the image above. (case insensitive)

No feedback yet

Leave a comment


Your email address will not be revealed on this site.

Your URL will be displayed.
(Line breaks become <br />)
(Name, email & website)
(Allow users to contact you through a message form (your email will not be revealed.)
This is a captcha-picture. It is used to prevent mass-access by robots.
Please enter the characters from the image above. (case insensitive)